威澳门尼斯人官网欢迎您 - Apple App Store

集团新闻

海外热点速报 | 玻利维亚艾尔西亚公路项目顺利移交

2023-12-04

The President of Bolivia, Mr. Luis Arce, has participated in the provisional reception of the El Sillar Dual Carriageway Project that demanded an investment of Bs 2,923 million. Eptisa has carried out the control and monitoring of the construction of the most important road work carried out in Bolivia.
This project is one of the most expensive in Bolivia due to the geographical characteristics of the section, which extends for 29.14 km and includes 4 tunnels, 9 bridges, 8 viaducts and 6,333 linear metres of retaining walls.


玻利维亚总统路易斯·阿尔塞先生参加了艾尔西亚公路项目的临时接收仪式。该项目地形复杂,公路全长29.14公里,包括4条隧道、9座桥梁、8座高架桥和6333延米的挡土墙,投资29.23亿玻利维亚比索,是玻利维亚投资最大的项目之一。Eptisa为艾尔西亚公路项目提供施工监理服务,负责施工质量控制与监测。

 
Baidu
sogou